Model Railway:

Hornby: LNER P2 Class 2003 'Lord President' - Era 3

2-8-2 - Era 3
Click to share your rating 0 ratings (0.0/5.0 average) Thanks for your vote!
$589.99
Hurry! Only 1 left at Mighty Ape!

The item is brand new and in-stock in a Mighty Ape warehouse. The item will ship within the timeframe shown.

Order now and it ships tomorrow
Free Delivery with Primate
Join Now

Free 14 day free trial, cancel anytime.

Buy Now, Pay Later with:

4 payments of $147.50 with Afterpay Learn more

6 weekly interest-free payments of $98.33 with Laybuy Learn more

4 payments of $147.50 with Zip Learn more

Availability

This product is In stock with Mighty Ape

The item is brand new and in-stock in a Mighty Ape warehouse. The item will ship within the timeframe shown.

Delivering to:

It should arrive:

  • 6-13 May using International Courier

Description

Hornby: LNER P2 Class 2003 ‘Lord President’ – Era 3

The London and North Eastern Railway (LNER) Edinburgh to Aberdeen route had steep gradients and tight curves and the express passenger service was usually worked by a double header of two small engines. To overcome this situation, Nigel Gresley, Chief Mechanical Engineer (CME) of the LNER began designing a new locomotive at the LNER Doncaster Works in 1932.

The 2–8–2 configured locomotive was given the classification P2 and had four driving axles for greater adhesion, an A3 type boiler and a Kylchap type blastpipe/chimney system. A total of six of the Class were built. As the first two were returned to Doncaster for repairs they were fitted with streamlined fronts similar to the A4 Pacifics. The last four to be built were outshopped with streamlined fronts.

By 1944 the whole Class had been withdrawn. Unlike its predecessors, 2003 ‘Lord President’ started life as a streamlined locomotive, borrowing from the design used on Gresley's A4 locomotives, although this streamlining only applied to the front of the locomotive and did not continue past the smokebox and cylinders in a bid to ease access for maintenance. The locomotive was allocated to the Haymarket Shed before being transferred to Dundee in September 1936 where it stayed until October 1942.

No. 2003 was the last P2 to be rebuilt as an A2/2. The engine entered the works in September 1944 and rebuilding was completed in December.

Technical Specification:

  • Gauge – OO
  • DCC Type – DCC Ready 8 pin socket
  • Minimum Curve – Radius 2
  • Length – 29.6 cm
  • Wheel Configuration – 2–8–2
  • Motor – 5 Pole Skew wound
  • Operator/Livery – LNER
  • Designer – Gresley
Release date NZ
December 20th, 2023
Manufacturer code:
R3985
Brand
Manufacturer
Box Dimensions (mm)
415x115x160
UPC
5055286690808
Product ID
35041786

Customer reviews

Nobody has reviewed this product yet. You could be the first!

Write a Review

Marketplace listings

There are no Marketplace listings available for this product currently.
Already own it? Create a free listing and pay just 9% commission when it sells!

Sell Yours Here

Help & options

Filed under...