Sold by Mighty Ape
This publication provides introductory technical guidance for mechanical engineers and other professional engineers, construction managers and facility managers interested in sampling and testing of industrial water systems, such cooling tower water systems. Here is what is discussed: 1. WATER SAMPLING AND TESTING, 2. COOLING TOWER WATER SAMPLING AND TESTING, 3. ROUTINE BOILER WATER SAMPLING AND TESTING, 4. WATER SAMPLING AND TESTING FOR CLOSED HOT AND CHILLED CIRCULATING WATER SYSTEMS, 5. WATER TESTING, 6. INTERPRETATION OF RESULTS FROM WATER TESTS, 7. IN-PLANT LABORATORY WATER TESTING REQUIREMENTS.
We are committed to protecting your rights under the Consumer Guarantees Act and working with our suppliers to assist with warranty claims. Products sold by Mighty Ape will be covered by a Manufacturer's Warranty for at least a one-year period from the date of purchase.
Your warranty will cover any manufacturing defects which, if existing, will present themselves within this warranty period.
Your warranty will not cover normal wear and tear, faults caused by misuse, and accidents which cause damage or theft caused after delivery. Using the product in a way it is not designed for will void your warranty.
Please refer to our Help Centre for more information.
Save with Primate
Save $5.95 with Discounted Shipping*
Earn $0.82 Points Credit*
Exclusive Deals
Mighty Ape Travel discount
^FREE 14 day trial. Primate will be charged $89 / 365 days after free trial, cancel anytime. Delivery benefits available in selected postcodes only. †*T&Cs apply, click for details.