Sold by Mighty Ape
This publication provides introductory technical guidance for civil engineers, environmental engineers and other professional engineers, construction managers and treatment plant operators interested in sludge handing, treatment and disposal. Here is what is discussed: 1. GENERAL CONSIDERATIONS, 2. SLUDGE PUMPING, 3. SLUDGE THICKENING, 4. SLUDGE CONDITIONING, 5. SLUDGE DEWATERING, 6. SLUDGE DIGESTION, 7. SLUDGE STORAGE, 8. BIBLIOGRAPHY.
Author Biography
Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years of experience in the design of buildings and related infrastructure. For an additional 9 years he was a principal advisor to the California Legislature on infrastructure and capital outlay issues. He is a graduate of Stanford University and has held numerous national, state and local offices with the American Society of Civil Engineers and National Society of Professional Engineers. He is a Fellow of ASCE and AEI.
We are committed to protecting your rights under the Consumer Guarantees Act and working with our suppliers to assist with warranty claims. Products sold by Mighty Ape will be covered by a Manufacturer's Warranty for at least a one-year period from the date of purchase.
Your warranty will cover any manufacturing defects which, if existing, will present themselves within this warranty period.
Your warranty will not cover normal wear and tear, faults caused by misuse, and accidents which cause damage or theft caused after delivery. Using the product in a way it is not designed for will void your warranty.
Please refer to our Help Centre for more information.
Save with Primate
Save $5.95 with Discounted Shipping*
Earn $0.80 Points Credit*
Exclusive Deals
Mighty Ape Travel discount
^FREE 14 day trial. Primate will be charged $89 / 365 days after free trial, cancel anytime. Delivery benefits available in selected postcodes only. †*T&Cs apply, click for details.